Fun Flavors Box
Freeze Dried Candy Wild Berry Originals Crunch Treats, 3 oz
Couldn't load pickup availability
Freeze Dried Wild Berry Originals – 3 oz
Bright, bold, and bursting with berry flavor—our Freeze Dried Wild Berry Originals take a juicy classic and give it an out-of-this-world crunch. These bite-sized treats start as chewy fruit-flavored candies, but once freeze-dried, they puff up into colorful, airy crunch bombs that melt in your mouth with a satisfying snap.
Every 3 oz bag is packed with sweet-tart wild berry goodness and a rainbow of flavors. Whether you're sharing them at a party, sneaking a handful at your desk, or tossing them in your bag for an on-the-go treat, they’re a wildly fun way to enjoy your favorite fruity candy—no stickiness, no mess.
Key Features:
-
Freeze-dried for a unique, crunchy texture that melts on your tongue
-
Packed with fruity, wild berry flavor in every colorful bite
-
A fun, mess-free twist on a chewy favorite
-
Perfect for gift bags, candy buffets, or everyday snacking
-
Lightweight, resealable, and great for travel
-
Made in the USA
-
Packaging may vary
Ingredients:
Sugar, Corn Syrup, Hydrogenated Palm Kernel Oil; Less Than 2% Of: Citric Acid, Tapioca Dextrin, Modified Corn Starch, Natural And Artificial Flavors, Sodium Citrate, Colors (Includes Red 40 Lake, Blue 2 Lake, Yellow 5 Lake, Blue 1 Lake, Yellow 6, Red 40, Yellow 5, Blue 1), Carnauba Wax.
Allergen Statement:
Produced in a facility that processes peanuts, tree nuts, soy, wheat, and milk products.

